<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>c8b26b5f-6570-4edc-a345-c2cb76e50fd0</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijrte.F7469.0311623</doi>
<citation_list><citation key="ref0"><doi>10.1016/j.ijproman.2014.10.013</doi><unstructured_citation>A. M. Takey, and M. M. Carvalho, Competency mapping in project management: An action research study in engineering company Int. J. Proj. Manage. Elsevier, 33, 784-796; http://dx.doi.org/10.1016/j.ijproman.2014.10.013 (2015). [CrossRef]</unstructured_citation></citation><citation key="ref1"><doi>10.1016/j.ijproman.2008.10.002</doi><unstructured_citation>Z. Isik, D. Arditi, I. Dikmen, and M. T. Birgonul, Impact of corporate strengths/weaknesses on project management competencies Int. J. Pro. Manage. Elsevier, 27, 629-637; http://dx.doi.org/10.1016/j. ijproman.2008.10.002 (2009). [CrossRef]</unstructured_citation></citation><citation key="ref2"><doi>10.1007/s11423-006-8251-y</doi><unstructured_citation>J. M. Brill, M. J. Bishop, and A. E. Walker, The competencies and characteristics required of an effective project manager: A web-based Delphi study&quot; ETR&amp;D Assoc. educ. Comm. Tech. 54(2), 115-140 (2006). [CrossRef]</unstructured_citation></citation><citation key="ref3"><doi>10.1016/j.scient.2011.03.026</doi><unstructured_citation>V. Shahhosseini, and M. H. Sebt, Competency-based selection and assignment of human resources to construction projects Scientia Iranica, Elsevier, 18(2), 163-180; http://dx.doi.org/10.1016/j.scient.2011.03.026 (2011). [CrossRef]</unstructured_citation></citation><citation key="ref4"><doi>10.1007/s13369-013-0631-0</doi><unstructured_citation>H. Sadeghi, M. Mousakhani, M. Yazdani, and M. Delavari, Evaluating project manager by an interval decision-making method based on a new project manager competency model Arab J. Sci. Eng. Springer, 39, 1417-1430; http://dx.doi.org/10.1007/s13369-013-0631-0 (2014). [CrossRef]</unstructured_citation></citation><citation key="ref5"><doi>10.1007/s12205-011-1291-9</doi><unstructured_citation>T. S. Lee, D. Kim, and D. W. Lee, A competency model for project construction team and project control team KSCE J. Civil Eng. Springer, 15(5),781-792; http://dx.doi.org/10.1007/s12205-011-1291-9 (2011). [CrossRef]</unstructured_citation></citation><citation key="ref6"><doi>10.1088/1757-899X/639/1/012026</doi><unstructured_citation>K. Kawesittisankhun, and J. Pongpeng, Construction team's competencies influencing contractor business competencies&quot; International conference on engineering, applied sciences and technology. IOP conference series: mathematic and engineering, 639, 012026; https://doi.org/10.1088/1757-899X/639/1/012026 (2019a). [CrossRef]</unstructured_citation></citation><citation key="ref7"><doi>10.1016/S0263-7863(98)90075-8</doi><unstructured_citation>F. T. Edum-Fotwe, and R. McCaffer, Developing project management competency: perspectives from the construction industry. Int. J. Pro. Manage. Elsevier, 18, 111-124; PII: S0263-7863(98)00075-1 (2000). [CrossRef]</unstructured_citation></citation><citation key="ref8"><doi>10.1016/j.ijproman.2007.09.011</doi><unstructured_citation>D. K. Ahadzie, D. G. Proverbs, and P. Olomolaiye, Toward developing competency-based measures for construction project manager: Should context behaviors be distinguished from task behaviors? Int. J. Pro. Manage., Elsevier, 26,631-645; http://dx.doi.org/10.1016/j. ijproman.2007.09.011 (2008). [CrossRef]</unstructured_citation></citation><citation key="ref9"><doi>10.1016/j.ijproman.2012.10.011</doi><unstructured_citation>F. Zhang, J. Zou, and G. Zillante, Identification and evaluation of the key social competencies for Chinese construction project manager. Int. J. Proj. Manage. Elsevier, 31, 748-759; http://dx.doi.org/10.1016/j.ijproman.2012.10.011 (2013). [CrossRef]</unstructured_citation></citation><citation key="ref10"><doi>10.1088/1757-899X/639/1/012027</doi><unstructured_citation>K. Kawesittisankhun, and J. Pongpeng, Relationships of construction project manager, engineer, and foreman skills. International conference on engineering, applied sciences and technology, IOP conference series: mathematic and engineering, 639, 012027; https://doi.org/10.1088/1757-899X/639/1/012027 (2019b). [CrossRef]</unstructured_citation></citation><citation key="ref11"><doi>10.1016/j.asoc.2011.10.004</doi><unstructured_citation>S. S. Gilan, M. H. Sebt, and V. Shahhosseini, Computing with words for hierarchical competency based selection of personnel in construction companies. Applied soft Comp., Elsevier, 12, 860-871; http://dx.doi.org/10.1016/j.asoc.2011.10.004 (2012). [CrossRef]</unstructured_citation></citation><citation key="ref12"><doi>10.1007/s10926-014-9511-z</doi><unstructured_citation>V. Johnston, K. Way, M. H. Long, M. Wyatt, L., Gibson, and W. S. Shaw, Supervisor competencies for support return to work: A mixed-methods study. J. occupational and habitats, Springer, 25,3-17; http://dx.doi.org/10.1007/s10926-014-9511-z (2015). [CrossRef]</unstructured_citation></citation><citation key="ref13"><doi>10.1108/SS-08-2015-0041</doi><unstructured_citation>Y. Y. Ling, and F. Tan, Selection of site supervisors to optimize construction project outcomes Structural Survey, Emerald, 33(4/5), 407-422; http://dx.doi.org/10.1108/ss-08-2015-0041 (2015). [CrossRef]</unstructured_citation></citation><citation key="ref14"><doi>10.1016/S0263-7863(01)00042-4</doi><unstructured_citation>J. Lampel, The core competencies of effective project execution: the challenge of diversity. Int. J. Proj. Mang. 19, 471-483; PII s0263-7863(01)00042-4 (2001). [CrossRef]</unstructured_citation></citation><citation key="ref15"><doi>10.1177/014920639101700108</doi><unstructured_citation>J. Barney, Firm resources and sustained competitive advantage. J. Manage. 17(1), 99-120 (1991). [CrossRef]</unstructured_citation></citation><citation key="ref16"><doi>10.7819/rbgn.v18i62.2242</doi><unstructured_citation>D. S. L. Marzagao, and M. M. Carvalho, The influence of project leaders' behavioral competencies on the performance of Six Sigma projects. Review. Buss. Manage. 18(62) 609-632; http://dx.doi.org/10.7819/rbgn.v18i62.2242 (2016). [CrossRef]</unstructured_citation></citation><citation key="ref17"><doi>10.2307/271028</doi><unstructured_citation>K. A. Bollen, Total, direct, and indirect effects in structural equation models. Sociological Met., 17, 37 - 69; https://doi.org/10.2307/271028 (1987). G. O. Young, &quot;Synthetic structure of industrial plastics (Book style with paper title and editor),&quot; in Plastics, 2nd ed. vol. 3, J. Peters, Ed. New York: McGraw-Hill, 1964, pp. 15-64. [CrossRef]</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
