<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>8b2c7457-e652-4db1-862d-5f5890340f18</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijrte.B7044.0711222</doi>
<citation_list><citation key="ref0"><doi>10.1504/IJPMB.2008.017962</doi><unstructured_citation>BADIGER, A.S. &amp; GANDHINATHAN, R., 2008. A proposal: evaluation of OEE and impact of six big losses on equipment earning capacity. International Journal of Process Management and Benchmarking. 2(3), pp.234-248. [CrossRef]</unstructured_citation></citation><citation key="ref1"><unstructured_citation>FLEISCHER, J., WEISMANN, U. &amp; NIGGESCHMIDT, S., 2006. Calculation and optimisation model for costs and effects of availability relevant service elements. Proceedings of LCE., pp.675-680.</unstructured_citation></citation><citation key="ref2"><unstructured_citation>SARI, M.F. &amp; DARESTANI, S.A., 2019. Fuzzy overall equipment effectiveness and line performance measurement using artificial neural network. Journal of Quality in Maintenance Engineering.</unstructured_citation></citation><citation key="ref3"><unstructured_citation>NAYAK, D.M., VIJAYA KUMAR, M., NAIDU, G.S. &amp; SHANKAR, V., 2013. Evaluation of OEE in a continuous process industry on an insulation line in a cable manufacturing unit. International Journal of Innovative Research in Science, Engineering and Technology. 2(5).</unstructured_citation></citation><citation key="ref4"><unstructured_citation>DR. DEVENDRA S. VERMA &amp; RAYMAL DAWAR, 2014. Measurement of Overall Equipment Effectiveness for Water Discharge System: A Case Study. International Journal of Engineering Research &amp; Technology (IJERT). , pp.737-743.https://www.ijert.org/research/measurement-of-overall-equipment-effectiveness-for-water-discharge-system-a-case-study-IJERTV3IS041015.pdf.</unstructured_citation></citation><citation key="ref5"><doi>10.1088/1757-899X/536/1/012061</doi><unstructured_citation>SAYUTI, M., 2019.Analysis of the overall equipment effectiveness (OEE) to minimize six big losses of pulp machine: a case study in pulp and paper industries in: Anonymous IOP Conference Series: Materials Science and Engineering, IOP Publishing, pp.012061. [CrossRef]</unstructured_citation></citation><citation key="ref6"><doi>10.1108/01443579910244223</doi><unstructured_citation>JONSSON, P. &amp; LESSHAMMAR, M., 1999. Evaluation and improvement of manufacturing performance measurement systems‐the role of OEE. International Journal of Operations &amp; Production Management. [CrossRef]</unstructured_citation></citation><citation key="ref7"><doi>10.1080/00207540601142645</doi><unstructured_citation>MUCHIRI, P. &amp; PINTELON, L., 2008. Performance measurement using overall equipment effectiveness (OEE): literature review and practical application discussion. International Journal of Production Research. 46(13), pp.3517-3535. [CrossRef]</unstructured_citation></citation><citation key="ref8"><doi>10.1016/j.proeng.2013.01.082</doi><unstructured_citation>SINGH, R., SHAH, D.B., GOHIL, A.M. &amp; SHAH, M.H., 2013. Overall equipment effectiveness (OEE) calculation-Automation through hardware &amp; software development. Procedia Engineering. 51, pp.579-584. [CrossRef]</unstructured_citation></citation><citation key="ref9"><unstructured_citation>OKPALA, C., ANOZIE, S. &amp; EZEANYIM, O., 2018. The application of tools and techniques of total productive maintenance in manufacturing. Int.J.Eng.Sci.Comp. 8(6).</unstructured_citation></citation><citation key="ref10"><unstructured_citation>NAKAJIMA, S., 1988. Introduction to TPM: total productive maintenance. (Translation). Productivity Press, Inc., 1988, pp.129.</unstructured_citation></citation><citation key="ref11"><unstructured_citation>BARVE, S.B., BIRAJDAR, H.S., BHONGADE, A.S. &amp; HEMANT, C., 2004. Application of total productive maintenance (TPM) to vertical boring machine. Industrial Engineering Journal. 33(7), pp.22-27.</unstructured_citation></citation><citation key="ref12"><doi>10.24247/ijmperdfeb2018123</doi><unstructured_citation>NALLUSAMY, S., KUMAR, V., YADAV, V., PRASAD, U.K. &amp; SUMAN, S.K., 2018. Implementation of total productive maintenance to enhance the overall equipment effectiveness in medium scale industries. International Journal of Mechanical and Production Engineering Research and Development. 8(1), pp.1027-1038. [CrossRef]</unstructured_citation></citation><citation key="ref13"><unstructured_citation>ALMEANAZEL, O.T.R., 2010. Total productive maintenance review and overall equipment effectiveness measurement. Jordan Journal of Mechanical and Industrial Engineering. 4(4).</unstructured_citation></citation><citation key="ref14"><unstructured_citation>NURPRIHATIN, F., ANGELY, M. &amp; TANNADY, H., 2019. Total productive maintenance policy to increase effectiveness and maintenance performance using overall equipment effectiveness. Journal of Applied Research on Industrial Engineering. 6(3), pp.184-199.</unstructured_citation></citation><citation key="ref15"><doi>10.11591/ijeecs.v18.i2.pp1040-1047</doi><unstructured_citation>ABD RAHMAN, M.S., MOHAMAD, E. &amp; ABDUL RAHMAN, A.A., 2020. Enhancement of overall equipment effectiveness (OEE) data by using simulation as decision making tools for line balancing. Indonesian Journal of Electrical Engineering and Computer Science. 18(2), pp.1040-1047. [CrossRef]</unstructured_citation></citation><citation key="ref16"><doi>10.1016/j.procir.2015.12.039</doi><unstructured_citation>ADOLPH, S., KÜBLER, P., METTERNICH, J. &amp; ABELE, E., 2016. Overall Commissioning Effectiveness: Systematic Identification of Value-added Shares in Material Supply. Procedia CIRP. 41, pp.562-567. Available from: https: //doi.org/10.1016/j.procir.2015.12.039. [CrossRef]</unstructured_citation></citation><citation key="ref17"><unstructured_citation>RAVISHANKAR, G., C. BURCZAK &amp; R. DE VORE., 1992.Competitive manufacturing through total productive maintenance in: Anonymous [1992 Proceedings] IEEE/SEMI International Semiconductor Manufacturing Science Symposium, IEEE, pp.85-89.</unstructured_citation></citation><citation key="ref18"><doi>10.1016/j.matpr.2020.02.820</doi><unstructured_citation>SURYAPRAKASH, M., PRABHA, M.G., YUVARAJA, M. &amp; REVANTH, R.R., 2021. Improvement of overall equipment effectiveness of machining center using tpm. Materials Today: Proceedings. 46, pp.9348-9353. [CrossRef]</unstructured_citation></citation><citation key="ref19"><doi>10.1109/WSC.2014.7019968</doi><unstructured_citation>BARLETTA, I., J. ANDERSSON, B. JOHANSSON, G. MAY &amp; M. TAISCH., 2014.Assessing a proposal for an energy-based Overall Equipment Effectiveness indicator through Discrete Event Simulation in: Anonymous Proceedings of the Winter Simulation Conference 2014, IEEE, pp.1096-1107. [CrossRef]</unstructured_citation></citation><citation key="ref20"><doi>10.1108/IJLSS-12-2020-0218</doi><unstructured_citation>MJIMER, I., AOULA, E. &amp; ACHOUYAB, E.H., 2021. Monitoring of overall equipment effectiveness by multivariate statistical process control. International Journal of Lean Six Sigma. [CrossRef]</unstructured_citation></citation><citation key="ref21"><unstructured_citation>AFEFY, I.H., 2013. Implementation of total productive maintenance and overall equipment effectiveness evaluation. International Journal of Mechanical &amp; Mechatronics Engineering. 13(1), pp.69-75.</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
