<?xml version="1.0" encoding="UTF-8"?>
<doi_batch version="4.3.0" xmlns="http://www.crossref.org/doi_resources_schema/4.3.0" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.crossref.org/doi_resources_schema/4.3.0 http://www.crossref.org/schema/deposit/doi_resources4.3.0.xsd">
<head>
<doi_batch_id>e2762414-d704-4287-9f77-55e4a470b4c5</doi_batch_id>
<depositor>
<name>beie</name>
<email_address>director@blueeyesintelligence.org</email_address>
</depositor>
</head>
<body>
<doi_citations>
<doi>10.35940/ijrte.F6786.0310622</doi>
<citation_list><citation key="ref0"><unstructured_citation>LWR Manual, &quot;Long Welded Rails, 3rd Revision,&quot; Indian Railways Institute of Civil Engineering (IRICEN), Pune, 2017.</unstructured_citation></citation><citation key="ref1"><unstructured_citation>International Union of Railways, &quot;UIC 774-3R, Track/Bridge Interaction Recommendations for calculations,2nd edition,&quot; International Union for Railways, Paris,France, 2001.</unstructured_citation></citation><citation key="ref2"><unstructured_citation>RSI Guideline, &quot;RDSO guidelines for carrying out rail-structure interaction studies on metro systems, Version 2,&quot; Research Designs and Standards Organization, India, 2015.</unstructured_citation></citation><citation key="ref3"><unstructured_citation>M. Petrangeli and C. Tamagno, &quot;Numerical Analysis of Rail Structure Interaction and Resonance in Railway Bridges,&quot; in 7th International conference on Short &amp; Medium span Bridges, Italy, 2006.</unstructured_citation></citation><citation key="ref4"><unstructured_citation>B. J. Shah and S. K. Surti, &quot;The Need for Rail Structure Interaction Analysis for Bridges: A State-of-the-Art Review,&quot; The IUP Journal of Structural Engineering, vol. 8, no. 3, pp. 47-61, July 2015.</unstructured_citation></citation><citation key="ref5"><unstructured_citation>P. Icke and G. M. Paice, &quot;Track-Structure Interaction Analysis using FE Modelling Techniques,&quot; in 3rd International Conference on Road and Rail Infrastructure - CETRA, Croatia, 2014.</unstructured_citation></citation><citation key="ref6"><unstructured_citation>D. R. Ahlbeck, A. Kish and A. Sluz, &quot;An Assessment of Design Criteria for Continuous Welded Rail on Elevated Transit Structures,&quot; Transportation Research Board, no. 1071, pp. 19-25, 1986.</unstructured_citation></citation><citation key="ref7"><doi>10.12989/imm.2012.5.1.001</doi><unstructured_citation>R. Kumar and A. Upadhyay, &quot;Effect of Temperature Gradient on Highspeed track with Track-Bridge Interaction,&quot; Interaction and Multiscale Mechanics, vol. 5, no. 1, pp. 1-12, 2012.</unstructured_citation></citation><citation key="ref8"><doi>10.1016/j.compstruc.2006.09.008</doi><unstructured_citation>P. Ruge and C. Birk, &quot;Longitudinal forces in continuously welded rails on bridge decks due to nonlinear track-bridge interaction,&quot; Computers &amp; Structures, vol. 85, no. 7, pp. 458-475, 2007.</unstructured_citation></citation><citation key="ref9"><doi>10.1016/j.engstruct.2019.109310</doi><unstructured_citation>Ó. Ramos Gutiérrez, F. Schanack, G. Carreras and J. Retuerto, &quot;Bridge length limits due to track-structure interaction in continuous girder prestressed concrete bridges,&quot; Engineering Structures, vol. 196, p. 109310, 2019.</unstructured_citation></citation><citation key="ref10"><doi>10.1201/9780203895399-7</doi><unstructured_citation>A. Cutillas, &quot;Track-bridge interaction problems in bridge design,&quot; Track-Bridge Interaction on High-Speed Railways,1st edition, pp. 29-38, 2008.</unstructured_citation></citation><citation key="ref11"><unstructured_citation>Ali, Ahammed and Sisir, &quot;Strength problems associated with track bridge interaction in presence of continuously welded rail,&quot; International Journal of Research Science &amp; Management, vol. 332, 2016.</unstructured_citation></citation><citation key="ref12"><doi>10.1201/9780203895399.ch15</doi><unstructured_citation>A. Reis, N. Lopes and D. Ribero, &quot;Track structure interaction in long railway bridges,&quot; Track-Bridge Interaction on High-Speed Railways,1st edition, pp. 185-200, 2008.</unstructured_citation></citation><citation key="ref13"><unstructured_citation>R. Simões, R. Calçada and R. Delgado, &quot;Track-bridge interaction in railway lines: Application to the study of the bridge over the River Moros,&quot; Track-Bridge Interaction on High-Speed Railways,1st edition, pp. 201-210, 2008.</unstructured_citation></citation><citation key="ref14"><doi>10.1061/(ASCE)BE.1943-5592.0000163</doi><unstructured_citation>R. Okelo and A. Olabimtan, &quot;Nonlinear rail-structure interaction analysis of an elevated skewed steel guideway,&quot; Journal of Bridge Engineering, vol. 16, no. 3, pp. 392-399, 2011.</unstructured_citation></citation><citation key="ref15"><doi>10.1155/2013/494137</doi><unstructured_citation>R. Chen, P. Wang and X.-k. Wei, &quot;Track-Bridge Longitudinal Interaction of Continuous Welded Rails on Arch Bridge,&quot; Mathematical Problems in Engineering, vol. 2013, 2013.</unstructured_citation></citation><citation key="ref16"><unstructured_citation>A. D. Rahul, G. H. Ashwin and B. G. Jignesh, &quot;Effect of Rail-Structure Interaction on Cable Forces for Railway Extradosed Bridges,&quot; International Research Journal of Engineering and Technology (IRJET), vol. 07, no. 06, 2020.</unstructured_citation></citation><citation key="ref17"><doi>10.3390/app11030922</doi><unstructured_citation>W. Liu, H. Lai, G. Dai, S. Rao, D. Wang and B. Wu, &quot;Numerical Study on Track-Bridge Interaction of Integral Railway Rigid-Frame Bridge,&quot; Applied Sciences, vol. 11, no. 3, 2021.</unstructured_citation></citation><citation key="ref18"><doi>10.1115/JRC2015-5661</doi><unstructured_citation>K.-C. Lee, S. Y. Jang, D.-K. Jung, H.-K. Byun, H.-K. Park and T.-S. Yang, &quot;Rail-Structure Interaction Analysis of Sliding Slab Track on Bridge,&quot; in Proceedings of the 2015 Joint Rail Conference, JRC, USA, 2015.</unstructured_citation></citation><citation key="ref19"><doi>10.14419/ijet.v7i3.19.17336</doi><unstructured_citation>L. Diachenko, A. Benin and A. Diachenko, &quot;&quot;Track-Bridge&quot; Interaction Problems in High-Speed Bridge Design,&quot; vol. 7, pp. 194-199, 2018.</unstructured_citation></citation><citation key="ref20"><doi>10.35940/ijrte.D8702.118419</doi><unstructured_citation>M. Touati, N. Lamdouar and L. Bouhlal, &quot;Track - Bridge Interaction on High Speed,&quot; International Journal of Recent Technology and Engineering (IJRTE), vol. 8, no. 4, pp. 1-6, 2019.</unstructured_citation></citation><citation key="ref21"><unstructured_citation>Indian Railways standards - Concrete Bridge Code, &quot;IRS code of Practice for Plain, Reinforced &amp; Prestresses Concrete for General Bridge Construction,&quot; RDSO, India, 2014.</unstructured_citation></citation><citation key="ref22"><unstructured_citation>Indian Railways standards - Bridge Rules, &quot;Rules specifying the loads for design of supertructure and substructure bridges and for assesment for assesment of the strength of existing bridges,&quot; RDSO, India, 2014.</unstructured_citation></citation><citation key="ref23"><unstructured_citation>MIADS Manual, &quot;Technical Manual Reference from MIDAS CIVIL software,&quot; MIDAS IT Co., Ltd, Korea, 2021.</unstructured_citation></citation><citation key="ref24"><unstructured_citation>IS 2911(Part 1/Sec 2), &quot;Design and construction of pile foundations- code of practice,&quot; Bureau of Indian Standard, India, 2011.</unstructured_citation></citation><citation key="ref25"><unstructured_citation>Indian Roadway standards - IRC 6, &quot;Standard specifications and code of practice for road bridges. Section II - Loads and Stresses,&quot; Indian Road Congress, India, 2017.</unstructured_citation></citation></citation_list>
</doi_citations>
</body>
</doi_batch>
