Loading

Integrated Management System for JSW Steel Melt Shop of 5 MTPA Capacity
Kommireddi Avinash1, S. Bala Murugan2, Sachin Vaidya3, Venkataramana Kota4

1Kommireddi Avinash*, Department of Civil, Vellore Institute of Technology, Vellore, Tamilnadu, India.
2S. Bala Murugan, Sr. Assistant Professor, Department of Civil, Vellore Institute of Technology, Vellore, Tamilnadu, India.
3Sachin Vaidya, Manager (Projects), Department of Civil, Gammon Engineers and Contractors Pvt. Ltd, Mumbai, India.
4Venkataramana Kota, Sr. Manager, Department of Civil, JSW Steel Dolvi works Mumbai, India.
Manuscript received on February 10, 2020. | Revised Manuscript received on February 20, 2020. | Manuscript published on March 30, 2020. | PP: 1347-1352 | Volume-8 Issue-6, March 2020. | Retrieval Number: F7672038620/2020©BEIESP | DOI: 10.35940/ijrte.F7672.038620

Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Over the last few years we have been facing many problems related to the Occupational Health and Safety, Environmental Safety and Quality in construction sites during the execution of project. Now-a-days the clients need the work to be done with full quality in safety manner. This Paper explains the “Integrated Management System (IMS)”. which integrates various departments like Execution, Planning, Design, Occupational health and safety, Environmental Safety, Human Resources, Quality Assurance/Quality Control etc., according to standards such as ISO 9001, uISO 14001 and OHSAS 18001. This IMS is one of emerging techniques that brings all the departments into a single one. This study was done by collecting the data by conducting interviews with professionals from all the departments in the Steel Melt Shop Construction Project such as Human Resource team, Design team, Procurementlteam, Execution Team, Quality team, Safety team etc. This Paper concludes with a detailed framework of IMS for a steel Melt shop Project by integrating the functions of various departments in the project and develops a basic plan of IMS for both Top level Management and Bottom Level Management. This IMS Plan has been Prepared for Contractors, its sub-contractors and other Stack holders if any involving in this project. This Integrated management system will minimize the overall cost, time and manpower.
Keywords: Environmental Safety, Quality Assurance/Quality control, Integrated Management System (IMS), standards.
Scope of the Article: Data Base Management System.