Improvement of Project Performance by Constraint Analysis and Root Cause Analysis of Last Planner System
T. Anand1, P. Sachin Prabhu2, H.A. Nishaant3
1T. Anand, Assistant Professor, Department of Civil Engineering, Kumaraguru College of Technology, Coimbatore (Tamil Nadu), India.
2P. Sachin Prabhu, Assistant Professor, Department of Civil Engineering, Kumaraguru College of Technology, Coimbatore (Tamil Nadu), India.
3H.A. Nishaant, Assistant Professor, Department of Civil Engineering, Kumaraguru College of Technology, Coimbatore (Tamil Nadu), India.
Manuscript received on 12 December 2018 | Revised Manuscript received on 23 December 2018 | Manuscript Published on 09 January 2019 | PP: 228-230 | Volume-7 Issue-4S November 2018 | Retrieval Number: E2038017519/19©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)
Abstract: An effective planning is required to overcome cost over-run and time over-run problems in construction which could be achieved with the help of lean concept. The aim of lean is to maximize the value, in other words minimizing the wastes. Last Planner System(LPS) is one such lean concept developed in order to improve the project performance by reducing the inefficiencies faced in construction project. The objective of this paper to present the results obtained from implementing the Last Planner System in the construction of an apartment project. A list of constraints have been found out during constraint analysis and various remedial measures have been suggested for look ahead planning. Based on number of occurrences of constraints, root cause analysis was done to determine the causes for variation in Percentage of Plan Completed(PPC). The effectiveness and reliability of the project was found to be increased about 75% after implementation of Last Planner System(LPS). A list of success factors and barriers for improvement of project performance have also been listed.
Keywords: Last Planner System, Look Ahead Planning, Constraint Analysis, Root Cause Analysis, Percentage of Plan Completed.