Loading

PR and Hysteresis Controlled PV fed Cascaded Boost Reboost Inverter Systems
T. R. Premila1, R. Krishna Kumar2

1T. R. Premila, Department of EEE, Vels Institute of Science, Technology and Advanced Studies, Chennai (Tamil Nadu), India.
2Dr. R. Krishna Kumar, Professor Head, Department of EEE, Vels Institute of Science, Technology and Advanced Studies, Chennai (Tamil Nadu), India.
Manuscript received on 21 October 2019 | Revised Manuscript received on 25 October 2019 | Manuscript Published on 02 November 2019 | PP: 4026-4030 | Volume-8 Issue-2S11 September 2019 | Retrieval Number: B15490982S1119/2019©BEIESP | DOI: 10.35940/ijrte.B1549.0982S1119
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Speed-regulation using hysteresis-controller framework is also one of the most authentic methods. This explains about the Proposed Resonant and Hysteresis control of cascaded boost–re-boost-inverter system with PV as source. The simulation for Cascaded-Boost-Re-Boost-Inverter-System (CBR-BIS) is done using Simulink and cascaded-loop-investigations are performed with PR & Hysteresis-Controllers. Results of CBR-BIS systems like rise-time, settling-time and steady-state error are taken .The objectives of this work are Maximum-Power-achievement and low- voltage-regulation of CBR-BIS. The outcomes represent that utmost-power is attained with low–speed-regulation using HC-controller.
Keywords: Hysteresis Controller, PR Controller.
Scope of the Article: Expert Systems