Financial and Work Management Analysis for Residential Construction: a Case Study
Abdul Aziz1, Sanjeet Kumar2

1Abdul Aziz, Department of Civil Engineering, K L University, (A.P), India.
2Dr. Sanjeet Kumar, Department of Civil Engineering, KL University, (A.P), India.
Manuscript received on 05 May 2019 | Revised Manuscript received on 17 May 2019 | Manuscript Published on 28 May 2019 | PP: 893-897 | Volume-7 Issue-6C2 April 2019 | Retrieval Number: F11650476C219/2019©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The traditional construction process has never been into the scheduling the time and cost management. As a result, there are lost of time, materials, cost and poor quality of construction. In recent years, software’s play vital role in resolving such problems in construction industry, which benefit financial and work management. Primavera is one such software which helps in planning the work to its maximum extent and help in improving the quality and productivity of work. It also helps in efficiently manipulating the project cost. The present study analyses the comparison of financial and work management of a traditionally constructed building (G+4 building, Osmania University, Hyderabad) and implementing the scheduled work and financial management using primavera to the same building and compares the results. The study discusses the pros and cons of the analysis of the above results. Thisstudy relieved that the primavera helps in optimization the construction project in scheduling and improves the productivity. The results will project the earned value graph which show the cost performance index and scheduled performance index of resources.
Keywords: Construction, Management, Primavera, Quality.
Scope of the Article: Construction Economics