Identification of Waste Materials in Construction Site and Practice of 3r in Construction Projects
Obellaneni Arun Raja1, D Satish Chandra2, SS. Asadi3
1Obellaneni Arun Raja, M.Tech Student, Department of Civil Engineering, Koneru Lakshmaiah Education Foundation Deemed to be University, (Andhra Pradesh), India.
2D. Satish Chandra, Associate Professor, Department of Civil Engineering, Koneru Lakshmaiah Education Foundation Deemed to be University, (Andhra Pradesh), India.
3SS. Asadi, Department of Civil Engineering, Vignan’s Foundation for Science, Technology and Research, Deemed to be University, (Andhra Pradesh), India.
Manuscript received on 04 May 2019 | Revised Manuscript received on 16 May 2019 | Manuscript Published on 28 May 2019 | PP: 758-763 | Volume-7 Issue-6C2 April 2019 | Retrieval Number: F11400476C219/2019©BEIESP
Open Access | Editorial and Publishing Policies | Cite | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)
Abstract: Construction building waste management has conventional globalized attention from the times. It consequences scientist ongoing investigate and examination extensively on construction waste management. In building waste management be able to create a float in reusing, lessening or recycling building waste the building owners and engineers be supposed to be alive educate about the strategies as well as valuable reuse for partition as well as detection of building waste fabric. This lessons spotlight on waste material classification in construction location, the fritter away know how to be majorly separated into two parts they are inert in addition to non inert through the combining in cooperation this mixtures construction fritter away resolve be obtained. The most important plan of this document is to bring together the information related to waste management of material in building to recognize the high fritter away materials taking place throughout the building, for this case feedback analysis will be conducted, 22 questions equipped in with the intention of 19 questions associated to waste formed and how it is managed and three questions are associated to individual estimation on waste materials in building projects.
Keywords: Identification of Waste Materials, 3R Practices, Questionnaire Survey, Analysis of Questionnaire Survey.
Scope of the Article: Composite Materials