Loading

Well Control using Drill Sim (One Circulation)
Ilavalagan
Ilavalagan,Assistant Professor Department of Mining Engineering AME Tuniversity Chennai (Tamil Nadu), India.
Manuscript received on November 12, 2019. | Revised Manuscript received on November 25, 2019. | Manuscript published on 30 November, 2019. | PP: 5903-5905 | Volume-8 Issue-4, November 2019. | Retrieval Number: D8841118419/2019©BEIESP | DOI: 10.35940/ijrte.D8841.118419

Open Access | Ethics and Policies | Cite  | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The Usage Of Petroleum In Daily Life Have Increased Much Where The Petroleum Industry Also To Be Develop To Match With The Need. Drilling, An Task Where Petroleum Is Pointed And The Location Is Drilled To Take Out The Petroleum And Petroleum Sub Products From Subsurface To The Surface. Drilling A Well Is Not Also An Easy Way It Have To Meet Some Problems Due To Formation Pressure, Hydrostatic Pressure Etc., To Maintain The Well And To Get Out The Petroleum Well Control Technique Were Used In The Industry. Well Control Means To Prevent The Kick And Safe Guard The Instruments And Peoples Working On The Well. There Were Two Methods To Control The Well, They Were One Circulation Method And Two Circulation Method. In This Paper I Used The Ari Drilling Simulator With Assumed Values And Run One Circulation Method And Finally Observing The One Circulation Method Results ,Given My Conclusion.
Keywords: Drilling Simulator, Engineer Method, Drillers Method , One Circulation Method Etc.
Scope of the Article: Digital Clone or Simulation.