Hydropower Potential of Agricultural Dam in Bukit Merah
E Roslan1, Suhail Shaari2, Faiz Zamri3, Afifi Akhiar4, Fatihah Salleh5, Zakwan Ramli6, Abd Halim Shamsuddin7
1E Roslan, College of Engineering, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia.
2Suhail Shaari, College of Engineering, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia.
3Faiz Zamri, Institute of Sustainable Energy, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia
4Afifi Akhiar, Institute of Sustainable Energy, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia
5Fatihah Salleh, Institute of Energy Policy and Research, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia.
6Zakwan Ramli, College of Engineering, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia.
7Abd Halim Shamsuddin, AAIBE Chair for Renewable Energy @ UNITEN, Universiti Tenaga Nasional, Jalan IKRAM-UNITEN, Kajang, Selangor, Malaysia.

Manuscript received on November 12, 2019. | Revised Manuscript received on November 25, 2019. | Manuscript published on 30 November, 2019. | PP: 6323-6326 | Volume-8 Issue-4, November 2019. | Retrieval Number: D5114118419/2019©BEIESP | DOI: 10.35940/ijrte.D5114.118419

Open Access | Ethics and Policies | Cite  | Mendeley | Indexing and Abstracting
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC-BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: Malaysia, although having a good number of small to medium hydro power potential sites, has still not exploited all of them. The focus of this manuscript is a feasibility study of the technical viability of power generation from a medium hydropower potential site, the Bukit Merah Dam site, on the Terusan Besar irrigation canal in northern region of Malaysia. This study is carried out using flow data of 2016 from the main irrigation canal of Bukit Merah dam. The data was obtained from Department of Irrigation and Drainage, Perak. The power capacity, yearly energy output of the potential hydro site are studied in this work. Technical analysis of the power output capacity and yearly energy output of three (3) hydro-turbine types (Kaplan, Propeller, and Francis) operable at the same given head and design flow were studied. The study shows that there is a potential capacity of 2.2 MW and an annual energy generation capacity of 7028.47 MWh at a turbine peak efficiency of 92.8% at a design flow of 19.23 m3/s using Kaplan turbine.
Keywords: Agricultural Dam, Hydropower and Potential sides.
Scope of the Article: Agricultural Informatics and Communication.