Real Time Implementation of Third Generation CRONE Control Strategy for Air Pressure System
V. Velmurugan1, N. N. Praboo2

1V. Velmurugan, Assistant Professor, Department of EIE, Arunai Engineering College, Tamilnadu, India.
2Dr. N.N.Praboo, Assistant Professor, Department of EIE, Annamalai University, Tamilnadu, India.
Manuscript received on February 10, 2020. | Revised Manuscript received on February 20, 2020. | Manuscript published on March 30, 2020. | PP: 1107-1112 | Volume-8 Issue-6, March 2020. | Retrieval Number: F7573038620/2020©BEIESP | DOI: 10.35940/ijrte.F7573.038620

Open Access | Ethics and Policies | Cite | Mendeley
© The Authors. Blue Eyes Intelligence Engineering and Sciences Publication (BEIESP). This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/)

Abstract: The primary objectives of this research work are design and implementation of Third Generation CRONE controller for Air Pressure System (APS). The mathematical modeling is determined using worst case modeling technique for different operating regions. The design and implementation of CRONE control strategy through worst case modelling and examined in real time. The performances of Third Generation CRONE (TGC) controller is compared with ZN-PI controller and the results are tabulated in terms of time domain and error indices. It is validated that the TGC controller gives better performances than ZN-PI controllers.
Keywords: Mathematical modelling, CRONE Controller, ZN-PI controller, Air Pressure System, Nichols Plot, Non Linear Optimization.
Scope of the Article: Numerical Modelling of Structures.